Anode Bake Furnace Refurbishment Project: Phase 02 – Rio Tinto Alcan, Sebree Works

Client: Rio Tinto Alcan
Location: Robards, KY
Project Architect/Engineer: Pechiney, Three I Design, Inc.
Services: ECM Contractor

BCI provided ECM services for the $37 million dollar project that included the removal and replacement of tub floor and the refractory in the existing 54 section anode bake furnace at the Sebree Works. The construction outage for the furnace replacement was 70 days. Over 250,000 man-hours were logged without a recordable incident on the project. Also part of the project were the structural steel modifications to building 261E that would provide high bay access for vacuum crane maintenance.

  • 1-BCI-Anode-Phase2
  • 2-BCI-Anode-Phase2
  • 3-BCI-Anode-Phase2
  • 4-BCI-Anode-Phase2
  • 5-BCI-Anode-Phase2
  • 6-BCI-Anode-Phase2
  • 7-BCI-Anode-Phase2
  • 10-BCI-Anode-Phase2
  • 11-BCI-Anode-Phase2
  • 12-BCI-Anode-Phase2
  • 13-BCI-Anode-Phase2
  • 14-BCI-Anode-Phase2
  • 15-BCI-Anode-Phase2
  • 16-BCI-Anode-Phase2
  • 17-BCI-Anode-Phase2
  • 18-BCI-Anode-Phase2
  • 19-BCI-Anode-Phase2